Streets, Roadways, Highways, & Bridges
Roadway Paving & Drainage projects representa large percentage of the company effort and involve complicated highwaydesign, divided lane parkways, route alignment, re-surfacing, lane widening,turning corridors, culverts, headwalls, gravity drains, inlet placement,and surface drainage.
Bridges and Highway Overpasses offer a real challengeto designers to match the functional requirements with the existing development.Several recent projects involve long arched and sloped configurations overwetlands and others involve simulating historic structures
Click here to see a listof recent representative paving and drainage projects.
Click here to see a listof recent representative bridges and highway projects.
For questions, or comments aboutthis site, contact the webmaster.
This page created and maintainedby Dean R. Plunk and ShaneWalker E.I.T.
Recent RepresentativePaving & Drainage Projects
Project: Dalrock Road Paving and Drainage
Berln HotelesClient: Dallas County
Cost of Project: $6,000,000
Description: Construction plans and specifications
Project: S.H. 75 Business - Corsicana
Client: Texas Department of Transportation
Cost of Project: $3,000,000
Description: Design of overpass for S.H.31 and Railroad in downtown Corsicana
Project: Chiesa Road
Client: City of Rowlett
Cost of Project: $2,500,000
Description: Reconstruction of 7,000 LF,Topographic Survey, Drainage Study, Geometric Design for a 4 lane dividedMajor Thoroughfare, Storm Sewer, Paving, Lighting, Landscaping
Project: FM 982
Client: Collin County
Cost of Project: $1,500,000
Description: Four sections;6600 LF; 4-Lane,Asphalt Roadway and Storm Sewers
Project: Coit Road North Paving & Drainage
alberghi a SivigliaClient: City of Frisco
Cost of Project: $1,843,000
Description: Extend roadway 8100 LF; 2-Lanesof Concrete Paving & Storm Sewers
Project: Stonebrook Road Paving
Client: City of Frisco
Cost of Project: $1,858,000
Description: Remove 2-Lanes, add 3-Lanestotaling 6500 LF of Concrete Parkway
Project: Hillcrest Road Paving & Drainage
Client: City of Frisco
Cost of Project: $2,350,000
Description: Construct five sections totaling8900 LF of 4-Lane, Divided, Concrete Roadway and Storm Sewers
Project: McKinney Road Paving & Drainage
Client: City of Frisco
Cost of Project: $1,258,000
Description: Extend roadway 5000 LF; 2-Lanesof Concrete Paving & Storm Sewers
Project: Allen Heights Drive Paving &Drainage Improvements
Client: City of Allen
Cost of Project: $426,000
Description: Construction of 2,600 LF of1/2 of a 4-Lane, Divided, Concrete Roadway and Storm Sewer
Project: Gordon Smith Drive Paving Improvements
Client: City of Rowlett
Cost of Project: $247,000
Description: Reconstruction of 1,750 LFof 37 Wide Industrial Street
Project: Phase I Streets and Drainage
Client: City of Elgin
Cost of Project: $515,000
Description: Existing street rehabilitationand reconstruction
Project: Street Improvements - TDOC Grant
Client: City of Elgin
Cost of Project: $240,000
Description: Reconstruct 5,000 LF of Streetwith Curb and Gutter, and Hot Mix; Reconstruct 5,000 LF of various UtilityAdjustments
Project: John W. Elliot Drive Paving andDrainage Improvements
Client: Frisco Economic DevelopmentCorp.
cheap hotel in Bad GasteinCost of Project: $213,000
Description: 800 LF Concrete Street Extension
Project: Park and Ride
Client: City of Lockhart
Cost of Project: $50,000
Description: TxDOT Grant for Kiss-N-RideParking Facility
Project: Park and Ride
Client: City of Elgin
Cost of Project: $105,000
Description: TxDOT Grant for Kiss-N-RideParking Facility
Project: Freese Drive Street Extension
Client: City of Sanger
Cost of Project: $125,000
Description: 1,300 LF of Street Extensionwith Asphalt and Curb and Gutter
Project: Hillcrest Road
Client: City of Frisco
Cost of Project: $575,000
Description: 3,100 LF Concrete Street Extension
Project: Nob Hill French Drain Improvements
Client: City of Carrollton
Cost of Project: $250,000
Description: Design French Drain behindcurbs in residential sections for underground seepage control
hotels BlackpoolProject: 1992 Bond Program Street Improvements(Phase II)
Client: City of Ennis
Cost of Project: $1,245,000
Description: 8,300 LF Concrete Street Reconstruction
Project: Prison Streets and Utilities
Client: City of Marlin
Cost of Project: $500,000
Description: 2,500 LF of New Curb and Gutterstreet and install related Water and Sewer Lines to serve the Private Prisonand Storm Sewer
Project: Paving and Drainage Improvements
Client: City of Sanger
Cost of Project: $1,335,000
Description: 9,900 LF Concrete Street Reconstruction
Project: North 1st Street Paving & Drainage
Client: City of Frisco
Cost of Project: $911,000
Description: Extend roadway 4200 LF with2-Lanes of Concrete Paving & Storm Sewers
Project: North 1st Street Phase-2 Paving& Drainage
Client: City of Frisco
Cost of Project: $607,000
Description: Extend roadway 2800 LF; 2-Lanesof Concrete Paving & Storm Sewers
Project: North County Road Phase-1 Paving& Drainage
Client: City of Frisco
Cost of Project: $391,000
Description: Extend roadway 1800 LF; 2-Lanes of Concrete Paving & Storm Sewers
Project: Dent Road Paving & Drainage
Client: City of Greenville
Cost of Project: $2,358,000
Description: Extend roadway 8300 LF with4-Lanes of Concrete Paving & Storm Sewers
Project: Brazos Street Paving & Drainage
Client: City of Lockhart
Cost of Project: $1,358,000
Description: Extend roadway 6168 LF with4-Lanes of Concrete Paving & Storm Sewers
Return To Top
Return to Hunter Home
RECENT BRIDGES &HIGHWAY OVERPASSES
Project: State Highway 31 Bypass
Client: State of Texas / City ofCorsicana
Cost of Project: $7,000,000
Description: Seven Bridges; Four LanesEach; Total Length 3100 ft
Currently working on the EnvironmentalImpact Statement
Project: Corsicana Business Overpass, Hwy45
Client: State of Texas / City ofCorsicana
Cost of Project: $2,500,000
Description: Four Traffic Lanes, 37 ftwide, 1250 ft long
Project: Winningkoff Road Bridge
Client: City of Lucas
Cost of Project: $285,000
Description: Two Traffic Lanes, One BridlePath, 37 ft wide, 120 ft long
Project: Lebanon Road Bridge
Client: City of Frisco
Cost of Project: $835,000
Description: Three Traffic Lanes, 35 ft wide, 400 ft long, 1,500 ft radius
Project: Parkwood Drive Bridge
Client: City of Frisco
Cost of Project: $270,000
Description: Two Traffic Lanes, One Walkway,50 ft wide, 120 ft long
Project: Lady of the Lake Bridge
Client: City of Lewisville
Cost of Project: $135,000
Description: Three Traffic Lanes, 35 ft wide, 80 ft long
Return To Top
Return to Hunter Home
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |